Dividing work into phases and interrelation of phases

Rate this Entry
Quote Originally Posted by ketanco View Post
In some cases it is much better to divide the project into project phases. This is necessary if you have group of activities that take place around the same time and same place usually. While doing this do not forget however that the construction project is to be considered as a whole and the interrelations between different phases can still affect your cost and schedule. Such as for instance, your building and sitework might be under different phases in your project plan or schedule but the access of equipment into one are might affect the work to another area. More specifically say for instance you are supposed to complete the brickwork at the exterior face of the building. You will need scaffolding for that. But what if you have an underground utility pipe running at the same location, which belongs to a different phase of the project? For things like these, you must coordinate the activities even if you are dealing with different phases.

Comments

Disclaimer: The information in this website is not legal advice and you need to confirm the accuracy of any information yourself, before using it. For your own situation consult a professional. The accuracy of information on this website is not guaranteed. Also, for every situation make sure to take any necessary safety precautions by consulting with a competent construction safety person, before performing any action. By using this site, you agree to these terms. If you do not agree to these terms, do not use this website. Also see forum rules for more terms of use (it is the first thread at the top under "General Discussion" category.)