Arranging concrete trucks Post date Home › Forums › Materials, Trades › Concrete › Arranging concrete trucks This topic has 0 replies, 1 voice, and was last updated 5 years ago by atuter. Viewing 1 post (of 1 total) Author Posts September 3, 2018 at 6:55 pm #472 atuterKeymaster Make sure to arrange enough number of trucks after each other when making a concrete pour that will require more than one truck. Delay of consequent truck will cause cold joints in the concrete, which may lead to very costly problems Author Posts Viewing 1 post (of 1 total) You must be logged in to reply to this topic. Log In Username: Password: Keep me signed in Log In → Earthwork