MS project cost entering

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #314
    atuter
    Keymaster

    I tried to enter cost resources and I am able to enter dollar amounts for rated and material costs, however there us a 3rd type, called cost resource i can not enter any values. later i discovered that you assign a cost to it by going into separate activities but everytime you need to assign value to it again. is there a way to assign a cost to a cost type resource and it can be used with the same cost for all activities?