When we erect silt fencing and place the sandbags around the site for erosion control at the beginning of construction, we need to have the city inspector (from the engineering or sewer department probably) to look at it. We must remember to put these in place as firmly as possible as during construction, as these will come off and when it does it might cause dirt escape from the jobsite.