Temporary hoist

Home Forums Temporary Items, Means & Methods Temporary hoist

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #376
    atuter
    Keymaster

    If you have temporary hoist on your job, such as on a high rise building construction project, make sure that you include the drop test and permits provided by the hoist supplier. They are to include all repairs during the course of the project, the gates, wing panels, thresholds. Any foundation required (and if you want the removal of it later) for the hoist should also be provided by this supplier.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.