Horizontal boring method for driving underground utility pipes without disrupting surface traffic and operations can be a very helpful tool for keeping your job under budget and within schedule. However it is only suitable where the soil is not sand and the groundwater is at a deeper level than the proposed drilling. Even if these two conditions are met, on project sites where considerable existing utilities may be present, the method should still be avoided.