pornolar porno indir turbanli porno
Results 1 to 2 of 2

Thread: Pile installation progress for large projects

  1. #1

    Pile installation progress for large projects

    The number of pile rigs and their performance play a very important factor in your schedule, if you are dealing with a lot of piles at big jobsites. On one of my jobs, we were building a power plant industrial facility, and the project had about 2500 cast in place concrete piles. Needless to say, we very closely monitored the progress of the pile subcontractor as the start of everything else depended on his progress. We had 4 pile rigs operating at the jobsite at its peak point.

  2. #2

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Disclaimer: The information in this website is not legal advice and you need to confirm the accuracy of any information yourself, before using it. For your own situation consult a professional. The accuracy of information on this website is not guaranteed. Also, for every situation make sure to take any necessary safety precautions by consulting with a competent construction safety person, before performing any action. By using this site, you agree to these terms. If you do not agree to these terms, do not use this website. Also see forum rules for more terms of use (it is the first thread at the top under "General Discussion" category.)